Electro Mechanical and Construction Projects |
|
|
|
1- Dissolving & renewal of Abo Qir sewage P.S. at Alexandria - April, 2006.
- Client : Alexandria Sanitary Drainage Co. (ASDCO)
- Owner : Alexandria Sanitary Drainage Co. (ASDCO)
- Contract Date: April, 2006
- Contract Amount: L.E. 929 500.00
- Location: Abo Qir bay, Alexandria governorate [Projects Map]
- Work Description:
- Supply and erection of :
- Two vertical sewage pumps 200 l/s @ 25 mw (KASMA VSG250/300).
- Two vertical motors 150 HP (Gamak - Turkey).
- Two cardan shafts (Clarke –England).
- Pumps sealing system.
- Suction & delivery pipeline with all valves. (Local).
- Main electric switchboard (ACETO - Local).
- Main penstock 800 mm.
- Two ventilation units (Local).
2- Supply & erection of electro-mechanical works at El-Qinayat City (Abo-Rashed & Abo-Rabieaa)
- Client : Egyptian Contracting Co. (Mokhtar Ibrahim).[ www.moukhtar.com ]
- Owner : National Authority for Potable Water & Sanitary Drainage (AGOSD).
- Contract Date: December, 2005
- Contract Amount: L.E. 2,630,124
- Location: El-Qinayat City – Al-Sharkia Governorate [Projects Map]
- Work Description:
- Supply and erection of :
- Low voltage electric switchboard for operation and control (ABB Arab).
- Five Overhead crane 3 ton & 2 ton (Hadef – Germany).
- Two diesel generators 200 KVA & 100 KVA (Perkins –England) c/w fuel tanks.
- Eight axial ventilation units c/w ducts (WOODS – England).
- Suction & delivery pipeline with all valves. (Local).
- Water-hammer protection system (Local).
- Light pools and lighting switchboard.
- Erection of:
- Eight vertical sewage pumps c/w cardan shafts and motors.
- Four submersible pumps for dewatering water from dry well.
- Two sealing system for main pumps glands.
3- Supply & erection of electro-mechanical equipment for Shubra Kebala village P.S.– March, 2005.
- Client : Misr Co. for Cement Works.
- Owner : National Organization for Potable Water & Sanitary Drainage.
- Contract Date: March, 2005
- Contract amount: L.E. 631, 400
- Location : Shubra Kebala Village – Al-Dakahlia Governorate.
- Work description:
- Supply and erection of :
- Two submersible sewage pumps (Flygt - Sweden).
- Low voltage electric switchboard for operation and control (MEMECO).
- Overhead crane 2 ton & axial rotating crane 1 ton.
- Two axial ventilation units c/w ducts (WOODS – England).
- Suction & delivery pipeline with all valves. (Local).
- Water-hammer protection system (Local).
- Light pools and lighting switchboard.
4- Dissolving and renewal of sewage P.S. # 1 at Kafr El-Shiekh.– March, 2005.
- Client : Egyptian Contracting Co. (Mokhtar Ibrahim).[ www.moukhtar.com ]
- Owner : National Organization for Potable Water & Sanitary Drainage.
- Contract Date: March, 2005
- Contract amount: L.E. 779, 050
- Location : Kafr El-Shikh City – Kafr El-Shikh Governorate.
- Work description:
- Supply and erection of :
- Three vertical sewage pump 8" (KASMA – Egypt) with cardan shaft and vertical motor 50 HP (FFD - Austria).
- Low voltage electric switchboard for operation and control (ACETO).
- Medium voltage electric switchboard (ACETO).
- Four submersible pumps for dewatering from dry well (Fips – Italy).
- Sealing system by means of two pumps (Calpida- Italy).
- Overhead crane 2 ton & axial rotating crane 1 ton.
- Two axial ventilation units c/w ducts (WOODS – England).
- Suction & delivery pipeline with all valves. (Local).
- Water-hammer protection system (Local).
- Light pools and lighting switchboard.
- Overhauling of :
- Two 300 KVA transformers on site.
|