Electro Mechanical and Construction Projects PDF Print E-mail

1- Dissolving & renewal of Abo Qir sewage P.S. at Alexandria - April, 2006. 

  • Client : Alexandria Sanitary Drainage Co. (ASDCO)
  • Owner : Alexandria Sanitary Drainage Co. (ASDCO)
  • Contract Date: April, 2006
  • Contract Amount:  L.E. 929 500.00 
  • Location: Abo Qir bay, Alexandria governorate [Projects Map]
  • Work Description:
    • Supply and erection of :
      • Two vertical sewage pumps 200 l/s @ 25 mw (KASMA VSG250/300).
      • Two vertical motors 150 HP (Gamak - Turkey).
      • Two cardan shafts (Clarke –England).
      • Pumps sealing system.
      • Suction & delivery pipeline with all valves. (Local).
      • Main electric switchboard (ACETO - Local).
      • Main penstock 800 mm.
      • Two ventilation units (Local).


2- Supply & erection of electro-mechanical works at El-Qinayat City (Abo-Rashed & Abo-Rabieaa)

  • Client : Egyptian Contracting Co. (Mokhtar Ibrahim).[ www.moukhtar.com ]
  • Owner : National Authority for Potable Water & Sanitary Drainage (AGOSD).
  • Contract Date: December, 2005
  • Contract Amount:  L.E. 2,630,124
  • Location: El-Qinayat City – Al-Sharkia Governorate [Projects Map]
  • Work Description:
    • Supply and erection of :
      • Low voltage electric switchboard for operation and control (ABB Arab).
      • Five Overhead crane 3 ton & 2 ton (Hadef – Germany).
      • Two diesel generators 200 KVA & 100 KVA (Perkins –England) c/w fuel tanks.
      • Eight axial ventilation units c/w ducts (WOODS – England).
      • Suction & delivery pipeline with all valves. (Local).
      • Water-hammer protection system (Local).
      • Light pools and lighting switchboard.
    • Erection of:
      • Eight vertical sewage pumps c/w cardan shafts and motors.
      • Four submersible pumps for dewatering water from dry well.
      • Two sealing system for main pumps glands.


3- Supply & erection of electro-mechanical equipment for Shubra Kebala village P.S.– March, 2005.

  • Client  : Misr Co. for Cement Works.
  • Owner  : National Organization for Potable Water & Sanitary Drainage.
  • Contract Date: March, 2005
  • Contract amount: L.E.  631, 400
  • Location  : Shubra Kebala Village – Al-Dakahlia Governorate.
  • Work description:
    •  Supply and erection of :
      • Two submersible sewage pumps (Flygt - Sweden).
      • Low voltage electric switchboard for operation and control (MEMECO).
      • Overhead crane 2 ton & axial rotating crane 1 ton.
      • Two axial ventilation units c/w ducts (WOODS – England).
      • Suction & delivery pipeline with all valves. (Local).
      • Water-hammer protection system (Local).
      • Light pools and lighting switchboard.

 4- Dissolving and renewal of sewage P.S. # 1 at Kafr El-Shiekh.– March, 2005.

  • Client  : Egyptian Contracting Co. (Mokhtar Ibrahim).[ www.moukhtar.com ]
  • Owner  : National Organization for Potable Water & Sanitary Drainage.
  • Contract Date: March, 2005
  • Contract amount: L.E.  779, 050
  • Location  : Kafr El-Shikh City – Kafr El-Shikh Governorate.
  • Work description:
    • Supply and erection of :
      • Three vertical sewage pump 8" (KASMA – Egypt) with cardan shaft and vertical motor 50 HP (FFD - Austria).
      • Low voltage electric switchboard for operation and control (ACETO).
      • Medium voltage electric switchboard (ACETO).
      • Four submersible pumps for dewatering from dry well (Fips – Italy).
      • Sealing system by means of two pumps (Calpida- Italy).
      • Overhead crane 2 ton & axial rotating crane 1 ton.
      • Two axial ventilation units c/w ducts (WOODS – England).
      • Suction & delivery pipeline with all valves. (Local).
      • Water-hammer protection system (Local).
      • Light pools and lighting switchboard.
    • Overhauling of :
      • Two 300 KVA transformers on site.

[More Electro Mechanical Projects]