Ayadco handed over El-Qinayat project in November 2007
Friday, 30 November 2007
Ayadco completed the prject of Abo Rashed and Abo Rabieaa at El-Qinayat in November 2007. The plants are being operated by Ayadco for the first three months.
Work Description:
Supply and erection of :
Low voltage electric switchboard for operation and control (ABB Arab).
Five Overhead crane 3 ton & 2 ton (Hadef – Germany).
Two diesel generators 200 KVA & 100 KVA (Perkins –England) c/w fuel tanks.
Eight axial ventilation units c/w ducts (WOODS – England).
Suction & delivery pipeline with all valves. (Local).
Water-hammer protection system (Local).
Light pools and lighting switchboard.
Erection of:
Eight vertical sewage pumps c/w cardan shafts and motors.
Four submersible pumps for dewatering water from dry well.
Two sealing system for main pumps glands.
Ayadco participates in the training of Mubarak-Cohl's project trainees
Wednesday, 25 July 2007
Ayadco has trained several trainees of Mubarak-Cohl's project. Ayadco has also offered summer training for several university students this year.
Four students of Alexandria Univ. - Agriculture faculty - Machinery section; are joining the company for summer training. They are having in-field practical training for installing mechanical and electrical equipments.
A new engineer joins the company
Wednesday, 25 July 2007
Engineer Heba Ayad has joined the company recently as a technical office engineer. She holds BSc in Production Engineering from Alexandria University.
AYADCO welcome eng. Heba and wish her a successful career with our team.